This shows you the differences between two versions of the page.
| Both sides previous revisionPrevious revisionNext revision | Previous revision | ||
| manual_mcf-lw06davk_davpk [2025/02/28 09:36] – supportadmin | manual_mcf-lw06davk_davpk [2025/03/17 09:42] (current) – [2.2 Installation] supportadmin | ||
|---|---|---|---|
| Line 109: | Line 109: | ||
| - Fasten the 6316CEU to the box | - Fasten the 6316CEU to the box | ||
| - Connect the red wire terminal “B” to the positive terminal of the battery “C”. | - Connect the red wire terminal “B” to the positive terminal of the battery “C”. | ||
| - | - Connect the white connector | + | - Connect the white connectors |
| - | {{ : | + | {{ : |
| === 2.2.3 Antenna === | === 2.2.3 Antenna === | ||
| Line 374: | Line 374: | ||
| ===== 12 Declaration of conformity ===== | ===== 12 Declaration of conformity ===== | ||
| - | Hereby, enginko Srl declares that MCF-LW06DAVK/ | + | Declarations |